|
Dave's RV-10 Builders Site
|
|
January 21, 2004
The areas in front of the front spar have been shot/squeezed, and we've shot the lower section of the front spar
He really digs the pneumatic squeezer! I set it up, and basically just feed him rivets. He does a pretty good job overall.
All of the front spar is done. This shot is from the middle of the leading edge looking back.
|
|
Email me |